Item# P-10275

PROACTIVE ENVIRONMENTAL PRODUCTS®

12 Volt Super-Twister® Plastic Pump

(Lifts 85 Feet / 26 Meters DTW)

The Engineered Plastic 12-volt submersible centrifugal Super Twister® pump is capable of pumping up to 85 feet from ground level (DTW)* by simply connecting the Super Twister® to a 12-volt deep cycle battery. Its reliable design is perfect for continuous sampling and purging of groundwater wells and Low Flow Sampling (Fractional Flow®).

 

The 12 Volt Super Twister® is ideal for low flow sampling (Fractional Flow®) in conjunction with Proactive Environmental Products Low Flow Sampling Controller. Low flow sample all the way down to 40 mL/s per minute. To achieve even a lower flow.... simply add the Low Flow Sampling Control Valve in conjunction with the Low Flow Sampling controller to achieve flow rates of 10 mL/s per minute or less!

 

Simplify and Expedite Your Next Sampling Event!

  • The Super Twister® can operate under harsh conditions with higher turbidity.

 

  • The Super Twister® can run continuously in water without the need for a cool down!

 

  • The Super Twister® reliable design is perfect for continuous sampling or purging of groundwater wells.

 

  • Can be used with low flow sampling controller.

 

This pump is not engineered to be dedicated in the physical liquid 24 hours a day.

* Depth to Water

Specifications:

POWER CONSUMPTION:                     195 WATTS (MAX)

VOLT RECOMMENDATION:                  12-15 DC (direct current) At Source

MAXIMUM AMP OUTPUT:                   13 AMPS

MEASUREMENTS:                                LENGTH 22" / DIAMETER: 1.82"

REQUIRED TUBING:                             3/8" or 1/2" ID TUBING

SUPPLIED WITH:                                 90 FEET OF HEAVY DUTY 10 GAUGE WIRE, QUICK

                                                         DISCONNECT PLUG & BATTERY CLAMPS

PUMP CONSTRUCTION:                        ABS

IMPELLER CONSTRUCTION:                  POLY ACETAL (POM)

MOTOR SHAFT CONSTRUCTION:           STAINLESS STEEL 

WIRE CONSTRUCTION:                         PVC

SEAL CONSTRUCTION:                          NITRILE 

  Pumping Depth in Feet               Gallons Per Minute    

  DTW (Depth To Water)          At 12.5 Volts At The Source

                  3                                             4.0

                 10                                            3.5

                 20                                            3.0

                 30                                            2.9

                 40                                             2.75

                 50                                            2.4

                 60                                            2.0

                 70                                            1.5

                 80                                            1.0

                 85                                            0.6

                 90                                            N/A

Test was conducted with a 12 volt deep cycle battery

at 12.5 volts at battery terminals

Running your vehicle while using this pump

will dramatically increase purge volume

OPTIONAL:

ACCESSORIES:

State Groundwater Monitoring Well Sampling Procedures:

  • Alabama Groundwater Monitoring Well Sampling Procedures

  • Alaska Groundwater Monitoring Well Sampling Procedures

  • Arizona Groundwater Monitoring Well Sampling Procedures

  • Arkansas Groundwater Monitoring Well Sampling Procedures

  • California Groundwater Monitoring Well Sampling Procedures

  • Colorado Groundwater Monitoring Well Sampling Procedures

  • Connecticut Groundwater Monitoring Well Sampling Procedures

  • Delaware Groundwater Monitoring Well Sampling Procedures

  • Florida Groundwater Monitoring Well Sampling Procedures

  • Georgia Groundwater Monitoring Well Sampling Procedures

  • Hawaii Groundwater Monitoring Well Sampling Procedures

  • Idaho Groundwater Monitoring Well Sampling Procedures

  • Illinois Groundwater Monitoring Well Sampling Procedures

  • Indiana Groundwater Monitoring Well Sampling Procedures

  • Iowa Groundwater Monitoring Well Sampling Procedures

  • Kansas Groundwater Monitoring Well Sampling Procedures

  • Kentucky Groundwater Monitoring Well Sampling Procedures

  • Louisiana Groundwater Monitoring Well Sampling Procedures

  • Maine Groundwater Monitoring Well Sampling Procedures

  • Maryland Groundwater Monitoring Well Sampling Procedures

  • Massachusetts Groundwater Monitoring Well Sampling Procedures

  • Michigan Groundwater Monitoring Well Sampling Procedures

  • Minnesota Groundwater Monitoring Well Sampling Procedures

  • Mississippi Groundwater Monitoring Well Sampling Procedures

  • Missouri Groundwater Monitoring Well Sampling Procedures

  • Montana Groundwater Monitoring Well Sampling Procedures

  • Nebraska Groundwater Monitoring Well Sampling Procedures

  • Nevada Groundwater Monitoring Well Sampling Procedures

  • New Hampshire Groundwater Monitoring Well Sampling Procedures

  • New Jersey Groundwater Monitoring Well Sampling Procedures

  • New Mexico Groundwater Monitoring Well Sampling Procedures

  • New York Groundwater Monitoring Well Sampling Procedures

  • North Carolina Groundwater Monitoring Well Sampling Procedures

  • North Dakota Groundwater Monitoring Well Sampling Procedures

  • Ohio Groundwater Monitoring Well Sampling Procedures

  • Oklahoma Groundwater Monitoring Well Sampling Procedures

  • Oregon Groundwater Monitoring Well Sampling Procedures

  • Pennsylvania Groundwater Monitoring Well Sampling Procedures

  • Rhode Island Groundwater Monitoring Well Sampling Procedures

  • South Carolina Groundwater Monitoring Well Sampling Procedures

  • South Dakota Groundwater Monitoring Well Sampling Procedures

  • Tennessee Groundwater Monitoring Well Sampling Procedures

  • Texas Groundwater Monitoring Well Sampling Procedures

  • Utah Groundwater Monitoring Well Sampling Procedures

  • Vermont Groundwater Monitoring Well Sampling Procedures

  • Virginia Groundwater Monitoring Well Sampling Procedures

  • Washington Groundwater Monitoring Well Sampling Procedures

  • West Virginia Groundwater Monitoring Well Sampling Procedures

  • Wisconsin Groundwater Monitoring Well Sampling Procedures

  • Wyoming Groundwater Monitoring Well Sampling Procedures

Copyright 2017 Proactive Environmental Products International LLC®. All rights Reserved.